EasyManua.ls Logo

IBM SCM - Page 48

IBM SCM
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
arm is properly located in the down position.
A
B
1
2
20. Plug in line cords
a. Plug the line cords into the node being serviced.
21. If an S-Biner power cable routing clip was previously removed: While keeping the power cable
correctly routed through the S-Biner, clip all S-Biners to the node being serviced.
44 Power Systems: SCM

Related product manuals