STEP 17:
Lay the (2C) left and (2D) right Towers on their backs. At the bottom of the (2C) left tower should be
one network cord and two DC connections (one small, one large). Carefully pull them out and
ensure no damage has been done to the network cable. At the bottom of the (2D) right tower should
be two network cords and two DC connections (one small, one large). Carefully pull them out and
ensure no damage has been done to the network cables. It might be possible that the network
cables can catchon internal wiring inside the towers. Wiggle the cable up, down, back and fourth
until it is free.