EasyManua.ls Logo

ICP OLB6-R097-130-5 User Manual

ICP OLB6-R097-130-5
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
il ii
I
OLB5-R /
OLB6-R
OLB5-F
i_!ii
OHB5-F /
OHB6-F
DNS_0562 Rev A
UPFLOW OIL WARM
AIR FURNACE
Save these instructions for future reference.
Printed in Canada 2001/12/03
445 01 4083 02
X40083 Rev. D
Question and Answer IconNeed help?

Do you have a question about the ICP OLB6-R097-130-5 and is the answer not in the manual?

ICP OLB6-R097-130-5 Specifications

General IconGeneral
ModelOLB6-R097-130-5
CategoryFurnace
ManufacturerICP
Efficiency80% AFUE
Input Capacity97, 000 BTU/hr
Fuel TypeNatural Gas/LP
Voltage115V
BTU97, 000

Summary

Installation

Safety Considerations

General safety guidelines for installing oil-fired heating units.

Safe Installation Requirements

Critical requirements and warnings for safe furnace installation and operation.

Safety Labelling and Signal Words

Explains hazard signal words (Danger, Warning, Caution) used in manuals and on products.

Freezing Temperature Precautions

Advises on preventing damage from freezing during cold weather when the unit is off.

Installation Regulations and Location

Lists applicable codes and guides furnace placement for safety and accessibility.

Venting

General Venting Information

Overview of general venting principles and methods for the furnace.

Chimney Installation

Specific instructions and warnings for venting the furnace through a chimney.

Flue Pipe Sizing

Guidance on selecting appropriate flue pipe sizes based on appliance input and chimney height.

Side-Wall Venting with DV-2000™ System

Details on the DV-2000™ system for side-wall venting and its components.

DV-2000™ Installation Considerations

Requirements for vent terminal location and installation clearances.

Connecting to Furnace Breech

Step-by-step instructions for connecting the DV-2000™ venting system to the furnace.

Connecting to Vent Terminal

Procedures for connecting the flexible vent to the vent terminal.

Installing Terminal in Wall

Steps for properly installing the vent terminal through the building wall.

Connecting Combustion Air Piping

Instructions for connecting the combustion air intake piping to the vent terminal.

Air for Combustion

General Air Requirements

Importance of adequate combustion air and factors affecting it.

Contaminated Combustion Air

Hazards and precautions when dealing with contaminated air sources.

Outdoor Combustion Air Kit - Chimney Venting

Information on certified kits for providing outdoor air for chimney-vented furnaces.

Ducted Outdoor Combustion Air

Guidelines for using ducted outdoor air for combustion with specific burners.

Oil Tanks and Lines

Burner Installation

Checking Polarity

How to verify correct electrical polarity for the burner control system.

Nozzles and Settings

Information on selecting and adjusting nozzles and air/turbulator settings.

Installing Accessories

Humidifier and Air Conditioning Installation

Guidelines for installing humidifiers and air conditioning coils.

Ductwork and Filter Installation

Proper installation of ductwork and air filters for optimal performance.

Operation

Manual Operation Switches

Description of manual switches for controlling furnace operation.

Sequence of Operation - Beckett AFII

Step-by-step operational sequence for the Beckett AFII burner.

Sequence of Operation - Riello 40-BF

Step-by-step operational sequence for the Riello 40-BF burner.

Sequence of Operation - AFG/Riello 40-F

Operational sequence for AFG and Riello 40-F burners with chimney venting.

Sequence of Operation - DV-2000™ System

Operational sequences for the DV-2000™ venting system, normal and abnormal.

Checks and Adjustments

General Checks and Adjustments

Routine checks and adjustments required for furnace maintenance.

Restarting a Stopped Burner

Procedure to follow if the burner stops unexpectedly.

Combustion Chamber Curing

Process for curing the ceramic combustion chamber before testing.

Smoke / CO2 Test Procedure

Steps for performing smoke and CO2 tests and adjusting burner air.

Supply Air Temperature Rise Test

Method for testing and calculating the air temperature rise across the furnace.

Vent Temperature Test

Procedure for measuring and interpreting vent temperature readings.

Fan Limit Adjustment

Adjusting fan limit settings for proper furnace operation.

Blocked Intake/Vent Test

Testing the safety shutdown system for blocked intake or vent conditions.

Maintenance

General Preventive Maintenance

Importance and overview of regular furnace inspection and maintenance.

Related product manuals