•
Installation
•
IDEAL 5221-95EP
The machine is delivered ready for operation.
4 strong people are required to lift the
machine from the pallet.
C
A
Side tables, left and right, (A) are available
as accessories.
Attach the side tables to the front table so
that the upper surface is level.
(Screws and nuts are in a plastic bag in the
tool set (C).
The front and rear wooden panels must be
removed for in-house transport on a pallet
truck.
For transport through narrow doors:
•
Remove side tables
•
Remove the machine from its base
(4 screws)
•
Tilt the machine on its side
•
Mount the machine to its base
•
Screw on all side panels
Only IDEAL 4810-95, IDEAL 4850-95
Tighten the backgauge crank (A). Parts and
tools are in the tool set (C).
A
C
- 13 -