Innovative DisplayWorks
G-11c/GCG-11c
Instruction Manual
STARTUP, OPERATION AND TEMPERATURE ADJUSTMENT
Operation
•Priortostockingcoolerwithproduct,itshouldbeoperatedemptyforhalfanhour.
Temperature Adjustment
Lit Door “Logo” Switch
Operation
•Thelightswitchlocatedatthebottomlefthandsideontherearofthe
cabinetistheON/OFFswitchfortheLitlogolocatedonthedoorofcooler.
REPAIR AND MAINTENANCE FOR REFRIGERATION DRAWER
* A CERTIFIED TECHNICIAN IS REQUIRED TO REPAIR ALL REFRIGERATION COMPONENTS
FOR WARRANTY PURPOSES.
Forconvenientrepair,therefrigerationcomponents(compressor,evaporator,condenser,
evaporationfan,condensationfanandlter)aredesignedusingasplit
system;anycomponentcanbeeasilyreplaced.Replacementprocedureis
asfollows:
1 Unplugtheunit.
2 Removethescrewsfromthefrontgrill,andthenremovethegrill.
3 Unplugallconnectionsandterminalsthatareinneedofrepair.
•G-11c/GCG-11cperformancetestingpositionofthethermostatisaround4.5-6.
4 Usingascrewdriver,removescrews
fromrefrigerationdrawer.
5 SlidetheRefrigerationDrawerouttoeasilyaccess
refrigerationcomponents.Removethecomponenttoreplaceorrepair.
6 Afterrepair,re-installallpartsusingthereverseprocedure.
REPLACING THE CANOPY LIGHT
1UnscrewtheGraphicsHolderontheLeftHandSideoftheTopCanopy
2CarefullyslideouttheentireGraphicspiece.
6ToinstallLEDlightparts,followtheabovedirectionsinreverseorder.
3DisconnecttheLEDlightwiring.
5RemoveLEDlightparts.
4PullouttheLEDlightpartsfromthetwoclips.
109