EasyManua.ls Logo

IIT Instron 3365 - Page 3

IIT Instron 3365
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev.
29/09/2020
Instron 3365 Load cell switching guide
3. Loosen the screw on top of the machine bar with the 8 mm hex key. Hold the cell from the bottom
to avoid it fall!
4. Locate and remove the alignment ring and the anti-rotation pin
5. Place the 2 KN cell at the back of the machine working plane, or the 10 N cell in its box
6. Insert the ring and pin in the cell to be mounted. Check for the hole marked in green on the 10 N
cell