EasyManua.ls Logo

Infinity ENTRA SUB TWO - Test Procedures

Infinity ENTRA SUB TWO
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENTRA SUB II TESTING PROCEDURE
A. Power Amp Section
Resistance
Check
Resistance from S+ (SPK O/P) to GND should be >1M W (NO LOAD)
Resistance from V+ (C6 P+) to V- (C8 P-) gradually Fully CHARGED should read >10k W
Resistance from V+ (C6 P+) to S+ (SPK O/P) should read >1MW
Resistance from V- (C8 P-) to S+ (SPK O/P) should read >1M W
2. Power Up LED RED
With a 5mV signal to Low level input, LED should change to GREEN
-Voltage measurements (DVM)
OP AMP
LED
P-U4(1) P-U4(7)
RED 0Vrms 11.84VDC
GREEN 7.13Vrms -12.93VDC
3. D.C. Operation
-Voltage measurements (DVM) on CLASS D POWER AMP
Between V+ Q4(E) Q1(C)
Q10(C)
U7(1) U7(2) U7(4) U7(6) U7(7) U7(8)
And This
Point
GND V- GND GND GND GND GND GND GND GND
Get this
Reading
71.7V 0V -71.7V 0V -71.7V -71.5V -71.2V 0V 0V 4.65V
4. Check Switching Frequency
· Oscilloscope - USE THE PROBE TIP TO U6(7) TO GND
· Reading 100kHz +/-10%,24Vp-p
B. Pre Amp Section
Line Level Input Sensitivity
-Set up Turn level, X’OVER FREQ POT Fully CW and LFE switch off
Generator Set at 200mV@50Hz
Signal to Line level input
Entra Sub Two

Other manuals for Infinity ENTRA SUB TWO

Related product manuals