EasyManua.ls Logo

Ingersoll-Rand Precedent WSC090E User Manual

Ingersoll-Rand Precedent WSC090E
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing
of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and
training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or
serious injury. When working on the equipment, observe all precautions in the literature and on the tags,
stickers, and labels that are attached to the equipment.
Packaged Rooftop Air Conditioners
Precedent™ — Heat Pump
3 to 10 Tons — 60 Hz
Installation, Operation,
and Maintenance
Model Numbers
WSC036H-WSC060H
WSC072H, WSC090E, WSC102H & WSC120H
W/DHC036H-W/DHC060H
RT-SVX23M-EN
April 2018

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Ingersoll-Rand Precedent WSC090E and is the answer not in the manual?

Ingersoll-Rand Precedent WSC090E Specifications

General IconGeneral
BrandIngersoll-Rand
ModelPrecedent WSC090E
CategoryHeat Pump
LanguageEnglish

Summary

Model Number Breakdown

Pre-Installation Procedures

Fiberglass Wool Handling Precautions

Outlines necessary PPE and safety measures when working with fiberglass insulation.

Dimensions and Weights Overview

Installation Procedures

Foundation Requirements

Guidelines for ground-level and rooftop foundations, including anchoring.

Roof Curb Installation

Steps to verify the correct curb, alignment, and sealing for proper installation.

Rigging and Lifting Procedures

Provides instructions and warnings for safely rigging and lifting the unit.

General Unit Installation Requirements

Checklist for verifying installation steps, shipping damage, and location requirements.

Horizontal Discharge Conversion (3-5 Ton)

Details the conversion process for 3-5 ton units to horizontal discharge.

Horizontal Discharge Conversion (5-10 Ton)

Details the conversion process for 5-10 ton units to horizontal discharge.

TCO-A Replacement for Horizontal Duct

Provides instructions for replacing the TCO-A limit control for horizontal duct configurations.

Main Electrical Power Requirements

Through-the-Base Gas Installation

Step-by-step instructions for installing the gas supply line through the base.

Gas Heat Installation Requirements

Lists requirements for gas piping, pressure, and safety for gas heat units.

Condensate Drain Configuration

Instructions for converting condensate drain to front or through-the-base.

Field Installed Power Wiring

Standard Field Power Wiring

Details location and connection for standard field power wiring.

Optional Through-the-Base Electrical Wiring

Explains wiring location and connection for the TBUE electrical option.

Field Installed Control Wiring

24 VAC Control Wiring Guidelines

Provides guidelines for 24 VAC control wiring, including conductor sizing and routing.

DC Analog Input/Output Wiring

Details wiring for DC analog signals, emphasizing conductor sizing and resistance.

Pre-Start Checklist

Three-Phase Voltage Imbalance

Explains how to measure and calculate voltage imbalance and its impact.

Electrical Phasing for Three-Phase Motors

Describes how to check and correct electrical phasing for proper motor rotation.

ReliaTel Controls Initialization

Describes the RTRM's self-diagnostics and the Liteport LED indication.

Unit Test Modes

Details three methods (Step, Resistance, Auto) for testing unit components.

Unit Start-Up Procedures

Sequence of Operation Overview

Introduces the two control options: electromechanical and ReliaTel™.

ReliaTel Controls - Constant Volume

Explains the ReliaTel™ control features and RTRM operation.

ReliaTel Cooling Without Economizer

Details how the RTRM controls cooling stages and compressors.

Low Ambient Operation Mode

Explains the RTRM's control strategy for low ambient temperatures.

Supply Air Pressure Control

Describes how the RTOM modulates the supply fan for static pressure control.

Supply Air Static Pressure Limit

Explains the shutdown procedure when supply air pressure exceeds a set limit.

Supply Air Temperature Controls

Details methods for controlling supply air temperature.

Supply Air Cooling/Economizer Control

Details how economizer and primary cooling control supply air temperature.

Zone Temperature Control

Describes methods for controlling zone temperature.

Single Zone VAV Applications

Overview of applications for Single Zone VAV systems.

Single Zone VAV Supply Fan Control

Explains control of the indoor fan speed via the RTOM for SZVAV units.

ReliaTel Cooling With Economizer Operation

Explains economizer control for zone temperature and compressor engagement.

ReliaTel Dehumidification Control

Explains ReliaTel system control for dehumidification.

Economizer Set-Up Procedures

Details setting minimum ventilation air and selecting outside air suitability methods.

ReliaTel Heating Operation (Cooling Only Units)

Explains RTRM control of first and second stage electric heat.

ReliaTel Heating Operation (Gas Units)

Describes RTRM communication with the Ignition module for gas heat control.

Heat Pump Sequence of Operation

Heat Pump Heating Operation

Details RTRM control of heating stages, compressors, and auxiliary heat.

Demand Defrost Function

Explains the system for defrosting coils based on icing conditions.

Verifying Proper Air Flow

Instructions for verifying airflow using fan performance tables and speed adjustments.

Economizer Start-Up Procedure

Steps for starting up the economizer, including minimum position settings.

Economizer Minimum Position (7.5-10 Ton)

Setting the minimum damper position for economizers on specific units.

Compressor Start-Up Procedure

Critical steps for starting compressors safely and correctly.

Scroll Compressor Start-Up

Details checking rotation, phasing, and operating pressures for scroll compressors.

Heating Start-Up Procedure

Continues the service test for heating start-up procedures.

Final System Setup Checks

Final checks before leaving the unit, including programming, panel security, and power application.

Maintenance Procedures

Fan Belt Adjustment (Belt Drive Units)

Instructions for inspecting, adjusting, and replacing fan belts for proper tension.

Evaporator and Condenser Coil Cleaning

Provides detailed instructions for cleaning coils to maintain efficiency.

Troubleshooting Guide

Wiring Diagrams Index

Related product manuals