PERMANENT TARGET GROUND TUBE INSTALLATION
East Coast Sales
(800) 476-3968
2850 Commerce Drive | Rock Hill, SC 29730
West Coast Sales
(800) 408-8449
900 S. Dupont Ave. | Ontario, CA 91761
www.innovadiscs.com
Parts (included per target
location)
Installation Tube
Installation tools and extras needed
Duct or packing tape
60 pounds of concrete per target
Post hole digger or auger
Torpedo level or carpenter’s level
One Target Pole & Locking Collar
assembled from Step 1 on page 2.
Locking Collar
24"
6"
Pole
Grade Level
Top of concrete
should be 2 inches
below grade
Installation
Tube
Target Pole
Padlock
(not included)
Diagram 1
Step 1 Dig a hole that is at least 6 inches in diameter and 24 inches deep. Most
manual post hole diggers create a 6 inch diameter hole, but if you are
installing an entire course it is maybe worth the money to rent a two man
auger with a 6 inch bit.
Step 2 Assemble one pole and locking collar according to Step 1 of Target
Assembly (see other page). Tape the bottom of the installation tube with
duct tape or packing tape to prevent any concrete getting into the tube
during installation. Place the installation tube in the hole with the tab
pointing towards the tee or line of play, (this will assure that the number
on the target faces the tee). The tab should be at, or slightly below grade
level to keep it away from lawn mower blades and to establish the correct
height for the target. Slide the target pole with locking collar attached
into the installation tube. This will keep cement out of the installation
tube while pouring. Just one pole with locking collar can be used to set
up the installation tubes for your entire course.
Step 1 Pour the concrete into the hole around the installation tube to no higher
than two inches below grade level. This will allow room for a padlock (not
included). Use a level to plumb the pole on at least two sides 90˚ from
each other. A torpedo level works best. After leveling the pole, make sure
the tab still points toward the tee or line of play, clean o any concrete on
the locking tab and then carefully remove the pole from the tube.
WARNING: Before digging always contact your local utilities and property maintenance to locate any
underground lines. (Water, Gas, Electrical, Sprinkler, etc...)
STOP
SET TING THE INSTALLATION TUBE (Diagram 1)
Page 1
w
w
w
.
i
n
n
o
v
a
d
i
s
c
s
.
c
o
m
Still have questions? Give us a call.
Question and Answer IconNeed help?

Do you have a question about the Innova DISCatcher and is the answer not in the manual?

Innova DISCatcher Specifications

General IconGeneral
BrandInnova
ModelDISCatcher
MaterialGalvanized Steel
Height52 inches
Assembly RequiredYes
TypeDisc Golf Target
Chains24
Chain ConfigurationDual Layer
PortableYes

Summary

Permanent Target Ground Tube Installation

Setting the Installation Tube

Guide for correctly positioning the ground tube for installation.

Digging the Installation Hole

Instructions for digging the hole for the ground tube.

Placing and Securing the Installation Tube

Steps for positioning the tube and pole before concrete.

Pouring Concrete and Leveling the Pole

Procedure for pouring concrete and ensuring the pole is plumb.

Assembling the Discatcher Target

Attaching the Locking Collar

Instructions for attaching the locking collar to the target pole.

Attaching the Basket

Steps for securing the basket to the target pole.

Attaching the Target Top and Chains

Procedure for attaching the target top and ensuring chains hang freely.