EasyManua.ls Logo

innovair VORTEX UV60C2DB1 - Page 10

innovair VORTEX UV60C2DB1
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
22 I
nstallation
When installing units on a roof, the structure must be capable of supporting the total weight of the unit,
i
ncluding a padded frame unit, rails, etc., which should be used to minimize the transmission of sound or
vibration into the conditioned space.
Factory preferred tie-down method (Optional)
Note:
These instructions are intended as a method to tie-down system to cement slab as a securing procedure for
high and areas. It is recommended to check Local codes for tie-down methods and protocols.
Step 1: Prior to installing clear pad of debris.
Step 2: Ensure cement pad is level.
IMPORTANT: Then cement pad must be made of HVAC-approved materials and must be the proper
thickness to accommodate fasteners.
Step 3: Center unit onto pad.
Step 4: Fasten 4 L-shaped stainless steel braces onto cabinet base using 4 1/4” * 1/2” Hex washer head
stainless steel self-tapping screws where indicated in following picture.
IMPORTANT: Do not use screws longer than indicated 1/4” * 2/3” and make sure that the brace is attached
o
n center of base ban where indicated in Fig.7. Damage will occur to system.
Step 5: Drill 4 holes into cement base ensuring holes are 2 1//2”dp.
Step 6: Assemble unit to cement pad using 4 1/4” * 2” Hex washer head
cement screws make sure not to over tighten.
Step 7:Finish unit assembly process as indicated in installation manual.
©2015 Innovair Corporation. All Rights Reserved.
www.innovair.com