Pg. 11V03042022
STEP 2
Place the Pull-up Crossbar (3) in position between the two main frames and insert four M10x75mm Hex Bolts (39) with
M10 Flat Washers (43) through each main frame. Place M10 Flat Washers (43) and M10 Locknuts (42) onto the bolts.
DO NOT TIGHTEN THE HARDWARE AT THIS TIME.
STEP 3
Lock the sliding carriages on the lowest (number 1) position. Place the Smith Bar (4) in between the rail slide mounts
of the frame. Make sure the through hole on the tabs of the bar is positioned as shown. Insert the Smith Bar Pins (22)
through both the Right, Left Smith Bar Sliders (60), (62) and into either end of the Smith Bar (4). Use four M6 Allen
Head Screws (47) on both sides to secure the Smith Bar Pins (22) to the Smith Bar Sliders (60), (62). Next place the
plastic Smith Bar End Caps (37) over the Smith Bar Pins (22) and secure with one M5x14mm Phillips Head Screw
(50) per side. Make sure the machine is on level ground and proceed to tighten all hardware installed in steps 1-3.
Adjust the two rear feet if needed to level the machine after tightening the hardware.
60
62