EasyManua.ls Logo

Instant Comfort Q2 User Manual

Instant Comfort Q2
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Q2, Q3
1. Unpackage all components & verify you
have everything required.
Immediatly discard all packaging as it can pose a
choking hazard.
1 Top Cover
1 Comfort Layer (Q3 Only)
1 or 2 Air Chambers
1 Unwrapped Rail Set
1 Bottom Cover
1 Air Control System
2. Ensure you have a base, foundation, or
adjustable platform ready for your new
bed.
3. Place the bottom cover on the foundation,
with the zipper side up. Position the two
holes at the head of the bed.
4. Insert the head, foot, & side rails inside the
bottom cover. Position the rails so that “This
Side Up” is up & visible. The rails will have a
snug fit when correctly installed.
5. If your mattress has two chambers,
place one in before the other & be sure
to pass the tubes through the holes in
the bottom cover.
6. Connect the tubes from the air
chambers to the connectors on the
control unit. Press the two ends
together until you hear a “Click.” Be
sure to keep track of which hose
connects to which side of the pump.
7. Connect the air control unit to a
powered surge protector* & plug the
hand controls into the each side. The
hand control will operate the air
chamber on the side that it is plugged
into.
*a surge protector is not included but is strongly
reccomended to prevent electrical damage not covered by
the warranty.
See the warranty for more information.
Assembly Instructions
Video Instructions available at
www.instantcomfort.com/assembly
Question and Answer IconNeed help?

Do you have a question about the Instant Comfort Q2 and is the answer not in the manual?

Instant Comfort Q2 Specifications

General IconGeneral
BrandInstant Comfort
ModelQ2
CategoryIndoor Furnishing
LanguageEnglish

Summary

Mattress Assembly and Setup

Initial Setup and Component Verification

Unpack all components, verify requirements, and prepare the bed base or foundation.

Bottom Cover and Rail Installation

Attach the bottom cover to the foundation and insert the head, foot, and side rails correctly.

Air System Connection and Inflation

Connect air chambers to the control unit, plug in hand controls, and prepare for inflation.

Mattress Final Assembly and Comfort Adjustment

Inflate air chambers, position them evenly, add comfort layer if applicable, and zip the top panel.

Finding Your Ideal Firmness Setting

Adjust firmness by starting firm and gradually reducing it until the desired comfort level is achieved.

Related product manuals