400 400
Installation steps of three-phase inverter:
(1) Use the wall hanging plate in the packing box to determine the hole positionθ As shown in
Figure 4.8. Level the holes with a level ruler and mark it with a marking pen.
Figure 4.8 Mark the punch position
(2) Drill 6 installation holes on the wall with electric drill. As shown in Figure 4.9.
Figure 4.9 Drilling
(3) Fix the expansion bolts to the 4/6 installation holes with hammer,
as shown in Figure 4.10.