Quick Install Guide
12
13
Click or Scan for
Step 8 video
Step 7: Connect FlexPipe to Mainline
1” end of FlexPipe:
Use 2-3 layers of Teon tape
and screw on FlexPipe
Step 8: Flush out the Pipes for 3 minutes
1. Point the flexpipe outside the hole.
2. Turn on the mainline to flush out.
3. Let water run for 3 minutes.
*This step is very important!
• It gets rid of any dirt, debris, or glue in pipes.
• Operating heads with unflushed debris in pipe voids warranty.
Click or scan for
Step 7 video