EasyManua.ls Logo

Isuzu 4LB1 - Page 105

Isuzu 4LB1
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
102 FUEL SYSTEM
7. Reassembly of governor lever related components
Assemble each lever and spring to the timing gear case.
Eye; start spring
Lever shaft
Guide piece
Snap pin
Shaft;
floatong lever
Plug
Start spring
Guide lever
Floating lever
Link plate
Main spring lever
Tensioner lever
Main spring
Set spring
8. Notes when assembling governor related components
(1) When assembling components, apply engine oil to each slide (such as the end face of the lever, the
hole in the shaft, and the periphery of the shaft).
(2) Install the set spring securely to the groove of the pin connecting the floating lever, with much care to
its assembling direction.
(3) Confirm that each lever moves by its dead weight before installing the start spring.
(4) After assembly, confirm that each lever moves smoothly.
And also confirm that each spring operates properly.
Fig. 198

Related product manuals