EasyManua.ls Logo

Isuzu A-4BG1T - Page 116

Isuzu A-4BG1T
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II II I I I I I II II II II II I I I I I I I I I
cover
Nozzle gasket
Sbecial gasket
V
!
Ezl
El
cl
+c
Important Operation
2. Injection Nozzle
Install the injection nozzles with the injection nozzle
gaskets.
Be careful not to damage the nozzle tips.
kgam (1b.f-t)
c
1
Injection Nozzle Bolt
Torque
1.7 - 2.1 (12.3 - 15.2)
b
,
3. Fuel injection Pipe and Fuel Leak Off Pipe
1) install the fuel injection pipes @ and tighten the
i:
bolts to the specified torque.
kgam (Ib.ft) e
/
Injection Pipe Torque
2.9 - 3.3 (21.0 - 23.9)
.
,
r
2) Carefully position and set the clips 0.
It is very important that each clip be positioned
correctly.
An improperly positioned clip will result in
objectionable fuel pulsing noise and injection
pipe breakage.
3) Install the fuel leak off pipes 0.
4. Oil filter
(When the oil filter is being removed in an oil filter
assembly with the filter cover.)
1). Before the installation, set the special gaskets
_. which are included within the repair kit with the
two oil filter mounting bolts.
2) Apply a coat of LOCTITE 271 on the bolt threads
to seal the oil leak from the crankcase as illus-
trated.
3) Install the oil filter assembly with tightening the
bolts securely.
kg*m (Ib.ft)
Oil Filter Assembly
4B
3.1-5.1 (22.4-36.9)
Me)unting Bolt Torque
6~
4.3-6.3 (31 J-45.6)
,
4

Related product manuals