EasyManua.ls Logo

Jacuzzi Aura Series User Manual

Jacuzzi Aura Series
48 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Manuale d’installazione
CONSERVARE CON CURA
Installation manual
KEEP CAREFULLY
Notice d’installation
GARDEZ SOIGNEUSEMENT
Installations Anweisung
SORGFÄLTIG AUFBEWAHREN
Manual de instalación
CONSERVAR CON CUIDADO
êÛÍÓ‚Ó‰ÒÚ‚Ó ÔÓ ÛÒÚ‡ÌÓ‚ÍÂ
ïêÄçàíú ÅÖêÖÜçé
vasche con cornice soprabordo
baths with above-edge frame
baignoires avec cadre recouvrant le rebord
Wannen mit aufgesetztem Rahmen
bañeras con marco sobre el borde
bанны с надбортовой рамой
DISEGNI all’interno · DRAWINGS inside
DESSINS a l’interieur · ZEICHNUNGEN innen
DIBUJOS en el interior · PИСУНКИ внутри руководства
1
2
3
Question and Answer IconNeed help?

Do you have a question about the Jacuzzi Aura Series and is the answer not in the manual?

Jacuzzi Aura Series Specifications

General IconGeneral
BrandJacuzzi
ModelAura Series
CategoryHot Tub
LanguageEnglish

Summary

Installation Preparation and Initial Steps

Pre-Installation Checks & Preparation

Verifying arrangements, unpacking, checking for defects, and ensuring clamp tightness before installation.

Preliminary Tub Positioning & Leveling

Placing, leveling, and adjusting the tub feet before permanent installation.

Taps and Fittings Assembly Guide

Instructions for assembling taps and fittings before the tub is fastened to the floor.

Plumbing & Electrical Connection Procedures

Connecting the siphon to the drain and making necessary electrical connections to the power supply.

Accessory and Panel Installation Procedures

Accessory Installation Steps

Steps for installing various accessories like spotlights, suction covers, and jet nozzles.

Perimeter Light Installation Guide

Instructions for installing the optional perimeter light system on the tub.

Tub Panel Installation

Procedures for installing methacrylate, Aura Corner, and Nova Corner panels onto the tub.

Post-Installation Checks

Performing checks after installation, including hydromassage cycles and securing tub feet.

Frame Assembly and Re-assembly

Heavy Frame Assembly (Marble/Granite/Stone/Corian®)

Guidelines for assembling heavy frames, including specific notes and warnings for material handling.

Corian® Frame Assembly Steps

Steps for assembling the Corian® frame, including gasket application and proper fastening.

Deviator & Control Panel Re-assembly

Instructions for re-assembling the deviator and control panel after servicing or maintenance.

Sanitising Inlet & Drain Control Re-assembly

Procedures for re-assembling the sanitising inlet and drain column control components.

Tub Positioning and Finalization

Final Tub Positioning & Securing

Moving the tub to its final location and securely fastening the feet to the floor.

Frame Sealing & Installation Completion

Applying silicone, glue, and removing spacers to complete the frame installation.

Frame Finishing and Customization

Frame Protective Treatment

Applying protective products to the frame surface after installation for durability.

Client-Provided Frame Installation Guide

Guidelines for clients installing custom frames from wood or other materials.

Electrical Diagrams and Component Identification

Jacuzzi Tub Electrical Wiring Diagrams

Diagrams showing electrical connections for various Jacuzzi tub models and configurations.

Component Color Coding Chart

A multilingual chart mapping component numbers to colors used in electrical diagrams.

Company Information and Compliance

Jacuzzi Europe Contact & Support

Contact information for Jacuzzi Europe S.p.A. and its international subsidiaries for support.

Product Certifications & Disclaimers

Information regarding TÜVRheinland certification and general product disclaimers.

Related product manuals