Rell Manual for
3M™ Novec™ 1230 Fire Protection Fluid
Sv Series, Mv Series, Lv Series
Issued May 31, 2011
DOC181 REV E
(June 23, 2020)
Question and Answer IconNeed help?

Do you have a question about the Janus 3M Novec 1230 and is the answer not in the manual?

Janus 3M Novec 1230 Specifications

General IconGeneral
Agent TypeNovec 1230
Cylinder MaterialSteel
Cylinder ColorRed
Extinguishing AgentNovec 1230
Fire ClassA, B, C
Discharge Time10 seconds
Actuation MethodManual

Summary

Preface

Section 1 General Information

1.1 Listings and Approvals

Details compliance requirements for FM Approval.

1.2 Extinguishing Agent

Describes Novec 1230 fluid properties, composition, and environmental impact.

1.3 Safety Considerations

Outlines essential safety guidelines and training requirements for cylinder filling.

Section 2 Cylinder Assembly

2.1 Cylinder

Describes the cylinder, its superpressurization, and fill density.

2.1.1 Rupture Disc

Explains the function and location of the rupture disc for emergency pressure relief.

2.1.2 Liquid Level Indicator

Details the mechanism and function of the liquid level indicator.

2.2 Dip Tube (Siphon Tube)

Describes the dip tube's purpose and connection to the cylinder valve.

2.3 Cylinder Valve

Explains the differential pressure operated valve controlling fluid release.

2.3.1 Sv Series Valve Features

Lists and describes the six key features of the Sv Series cylinder valve.

2.3.2 Mv Series Valve Features

Lists and describes the six key features of the Mv Series cylinder valve.

2.3.3 Lv Series Valve Features

Lists and describes the five key features of the Lv Series cylinder valve.

Section 3 Fill Components

3.1 Fill Adapter

Explains the purpose and types of fill adapters for cylinder connection.

3.1.1 Sv Series Fill Adapter

Details the Sv Series fill adapter, its connections, and check valve.

3.1.2 Mv Series Fill Adapter

Details the Mv Series fill adapter, its connections, and check valve.

3.1.3 Lv Series Fill Adapter

Details the Lv Series fill adapter, its connections, and check valve.

3.2 Cylinder Fill Assembly

Describes the assembly of fittings and valves connecting fill station to cylinder.

3.2.1 Pump Connection Port

Details the pump connection port and its function in the fill assembly.

3.2.2 Cylinder Connection Port

Details the cylinder connection port and its function in the fill assembly.

3.2.3 Gauge Connection Port

Details the gauge connection port and its function in the fill assembly.

3.2.4 Nitrogen Pressurization Port

Details the nitrogen pressurization port for superpressurizing the cylinder.

3.3 Nitrogen Regulator/Hose Assembly

Describes the assembly for regulating and supplying nitrogen for pressurization.

3.3.1 Valve Closing Line

Explains the valve closing line for seating the cylinder valve piston.

3.3.2 Cylinder Pressurization Line

Explains the line used to supply nitrogen for cylinder pressurization.

3.4 Valve Closing Adapter

Describes the adapter used to close the cylinder valve with nitrogen pressure.

3.5 Agent Supply Tank

Discusses supply tank types (drums, IBCs) for Novec 1230 fluid.

3.5.1 IBC Container

Details handling IBC containers and the need for nitrogen pressurization.

3.5.1.1 IBC Coupler Kit

Describes the kit for connecting nitrogen supply to an IBC container.

3.5.1.2 Low Pressure Nitrogen Regulator

Explains the regulator used for nitrogen supply to IBC containers.

3.5.2 Supply Drum

Discusses using supply drums and the need for filtered air with desiccant.

3.6 Agent Fill Station

Describes the equipment used to pump liquid agent into the cylinder.

3.6.1 Fill Station Displays

Explains the function of liquid/moisture indicator, inlet, and discharge pressure gauges.

3.6.2 Selector Control Knob

Details the selector knob for controlling agent flow direction.

3.6.3 Pump Control Knob

Explains the pump control knob for adjusting fill station pump speed.

3.6.4 Agent/Nitrogen Selection Knob

Describes the knob for switching between agent and nitrogen fill modes.

Section 4 Fill Procedure

4.1 Log and Weigh Empty Cylinder

Details recording cylinder information and initial weighing before filling.

4.2 Agent Fill Procedure

Outlines the process for filling the cylinder with Novec 1230 fluid.

4.2.1 Seating Cylinder Valve

Describes using nitrogen to seat the cylinder valve piston before disconnecting.

4.2.2 Cylinder Weighing

Details the procedure for weighing the cylinder after filling to determine agent amount.

4.2.3 Overfill Retrieval Procedure

Explains how to retrieve excess agent if an overfill occurs.

4.3 Pressurization Procedure

Details the process of superpressurizing the cylinder with nitrogen.

4.3.1 Finalization Procedure

Outlines final steps including standing, leak checking, and recording weights.

4.3.2 Leak Checking

Describes the methods and tools for testing cylinder assemblies for leaks.

Appendix A Material Safety Datasheet

Section 5 System Recharge and Reset

5.1 Piping and Nozzles

Details inspection and maintenance of piping and nozzles for damage.

5.2 Recharging

Outlines the overall process of recharging a system cylinder.

5.2.1 Removing The Cylinder

Steps for safely removing a cylinder from the system for recharge.

5.2.2 Cleaning and Servicing The Valve Assembly

Procedures for cleaning and servicing the cylinder valve assembly.

5.2.3 Recharge Procedure

Summarizes the recharge process, referring to Section 4 and installation manual.

Appendix B Assorted Charts

Appendix C Liquid Level Indicator Replacement