EasyManua.ls Logo

Jerr-Dan MPL - Page 36

Default Icon
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section II: Operation
Page 28
5-376-000102
REV. 1 - 07/10
2. Position and align the truck to
obtain as direct a pull as possible.
Straight line pulls are the best and
most efficient.
3. Set the brakes on your Jerr-Dan
unit. The use of scotch blocks is
also recommended.
4. Unfold the under lift boom.
5. Disengage the winch “free-spool”
by pulling out on the “T” handle
and turning the handle 90°. The
handle should remain in the “free-
spool” position. Never turn this
handle while the wire rope is
under load! This allows the wire
rope to be pulled directly off the
drum to the work.

Other manuals for Jerr-Dan MPL

Related product manuals