EasyManua.ls Logo

JetChill Twin Probe - Page 44

Default Icon
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SET UP
STEP 5
• Ensure black Rubber O Ring is in the
Cylinder End of the Gas Hose
• Replacement O Rings supplied in Tool Kit,
contact JetChill for additional replacement
O Rings
STEP 6
• Screw Gas Hose clockwise tight, onto
Cylinder of Food Grade Liquid Co2 with
Eductor / Siphon / Dip Tube, using
Wrench provided
• Open Cylinder valve by hand turning Valve
90 degrees anticlockwise
• Ensure Connection not frosting or making
a hissing sound from Co2 Gas leaking
STEP 7
• Plug Power Lead into Mains and side of
Machine
• LED’s inside Machine light up and close
Lid to check both blue Charge Button
Lights come on
• Machine now ready to prime
STEP 8
• Place two dry JetChill Glasses on Machine
Probes and ensure Glasses locate
correctly on Probe Nipples
• Turn Handle down over Glasses, close Lid
and press NORMAL Charge Button once
to prime Gas through Machine
• Glasses now ready to charge with Dry Ice