7 of 40
4. CONTENTS
The complete lift is contained in two (2) packages:
1. The main structural components are pre-assembled and packaged one on top of the other.
1. The remaining parts are packed in an accessory box. Refer to the packing slip inside the
accessory box for a list contents.
Main Structural Components:
1pc. - Left Side Main Frame Assembly; Runway, Scissors and Base Frame
1pc. - Right Side Main Frame Assembly; Runway, Scissors and Base Frame
Note: Hydraulic lines in base frames have been factory installed
Other Structural Components:
1pc. – Console and accessory box. (See accessory box list for contents)
1pc. – Grout container
1pc. – Customer care kit including manuals
5. TOOLS REQUIRED FOR INSTALLATION
* Rotary Hammer Drill or Similar, ¼" and ½” Concrete Drill Bits
* 4' Level
* SAE Wrenches and Sockets
* Hammer
* Pry Bar
* Chalk Line
* Tape Measure
* Side Cutters
* Screw Drivers
* Hydraulic Fluid ISO 32 (10 weight hydraulic oil) - (20 liters / 5.3Gal.)
* Funnel
* Utility Knife
Recommended:
* Laser Leveler
* Plumb Bob
* Impact Gun
* Boom and/or Engine Hoist
* 8’ Sling