EasyManua.ls Logo

JP FJH-4/1C-E - Page 11

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JP Heater
7
The heater installation location should be selected from
load-bearing floor, double floor or underfloor.
If there is no suitable floor, you can first make a load
bearing surface with plywood.
The heater must be firmly fixed to the mounting surface
with screws to prevent damage to the diesel pipeline
during
and cause danger.
Depending on the actual installation, may only install three
screws. Two die-cast aluminum fixing screws are fixed
then choose a plastic right angle to fix it.
To ensure that the heater evenly distributes heat, the
heater should be installed in the center as much as
possible to ensure that the heating circuit is equal long as
possible.
No cover is allowed to add to the heater surface.
The size with* is the smallest size, leaving enough space
to connect accessories such as diesel and water pipes.
Figure 4