EasyManua.ls Logo

Jumpking Oval POD - Step 1: Assembling the Frame; Frame Base and Top Rail Construction

Jumpking Oval POD
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
STEP 1 : ASSEMBLING THE FRAME
You will need the following parts to complete
section 1:
2 x Top tube with A marking
2 x Top tube with B marking
2 x Top tube with C marking
2 x Top tube with D marking
8 x L legs
4 x V legs
- Part A
- Part B
- Part C
- Part D
2 x Top tube with E marking
- Part E
2 x Top tube with F marking
- Part F
- Part G
- Part H
16 x Self tapping screws and washers
- Part Q
You will also need a cross-head screwdriver (not
supplied).
y
Fisrt
ou will need to assemble the leg bases
of your OvalPOD. This will require 2 x L-legs
and 1 x V Leg.
Note:
Do not screw the sections together yet.
Lay out the 2 x L-legs and 1 x Centre Leg so that it
makes a ‘W’ shape. Join the three pieces so the
screw holes line up.
Repeat this step with the remaining pieces to
make 4 x ‘W Legs’. Leave to one side when
nished.
Layout Top Rail B, Top Rail A and Top
Rail C curving away from you as if
you are making the trampoline
upside down and a
ach. You should
only
be able to see 2 spring holes
on each top rail.
A
A
B
B
C
Layout Toprail D, E and F cu rving
away from you and ensuring you can
top rail. Connect Top rail D together
sleeve on top rail D is on the left
side. Attach this to the other top rails.
D
D
E
E
F
Assemble 1 (A, B, C)
Assemble 1 (D, E, F )
only see 2 spring holes on each
A
B
C
D
E
F
H
Self tapping screw and washer
Cross-head screwdriver
G

Related product manuals