EasyManua.ls Logo

JVC XV-N40BK - Page 12

JVC XV-N40BK
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
XV-N40BK,XV-N44SL
1-12 (No.A0040)
2.2.4 Removing the loading motor (See Figure 10 and Figure 11)
Prior to the following procedure, remove the tray, the traverse
mechanism assembly, and the elevator.
(1) Remove the belt from the pulley.
(2) Remove two screws C attaching the loading motor.
(3) Remove two solders h on the switch board.
Fig.10
Fig.11
Loading base
Slide cam
Belt
Pulley
Pulley
C
C
Loading motor
Switch board
Part h

Related product manuals