EasyManua.ls Logo

Keba KeContact P20 - Authorization (Optional)

Keba KeContact P20
60 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
KeContact P20/P30 - Floor-mounted column, v2.40, #90333 13
© KEBA 2012-2016
Making drillholes
Mark the 6 holes on the concrete foundation using the baseplate of the floor-mounted
column.
Make sure that the connection cable is located precisely underneath the opening in the
baseplate.
Drill the 6 mounting holes:
Diameter: 10 mm
Drill-hole depth: 33 mm
Hammer the enclosed dowels using the Hilti HSD-G manual setting tool (not included
in the scope of delivery) so that they are flush with the floor.
Hilti HSD-G manual setting tool. Source: Hilti
Please also observe the following instructions:
Instructions on inserting the dowels. Source: Hilti
Floor-mounted column from below
Thread in cable
Thread the connection cables from the
bottom through the column upwards
through the cable opening.

Other manuals for Keba KeContact P20

Related product manuals