EasyManua.ls Logo

Keba KeContact P30 - Page 11

Keba KeContact P30
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P30 Frequently asked questions (FAQ)
FAQ V1.01
11
© KEBA
Illustration2-2: Opening the power supply terminal
Are there options for controlling the charging current?
Enable input [X1] to activate or deactivate the charging process
Smarthome Interface (UDP), e.g. Loxone, Cohere, Smartfox
Local charging management with P30 x-series
For connection to an OCPP backend: Specification by the OCPP back-
end
What must be observed for installation in a (underground) garage?
Official requirements
Fire service regulations (ventilation systems, emergency shut-off de-
vices)
When using GSM, check the signal strength in advance
When laying power supply cables and network cables, steel conduit
pipes should be used for surface installation (sabotage-proof)
Are there any additional installation options?
Yes, on a column base. The information in the corresponding installation in-
structions must be observed.
When is the system ready for operation?
The charging station is ready for use if at least the left 3 segments of the
LED bar are flashing.

Other manuals for Keba KeContact P30

Related product manuals