[D] Handling
1 Preparation before running
(1)Make sure to purge air in the inflatable ring on the pressure gauge(G-1) by closing
valve and opening valve.
(2)Purge air in the casing by opening plug. And close plug.
(3)Open valve.
(4)Begin running of the cooling water pump.
2 Handling procedure of the inflatable ring
This seal is to be used in the inspection or replacement of a seal ring at sea.
In working with this seal, make sure the shaft does not rotate.
Handling procedure is as follows.
(1)Stop the propeller shaft.
(2)Close valve and valve.
(3)Open valve gradually so that the air pressure becomes 0.3 0.6 MPa in
Gauge(G-1).
(4)Open plug and make sure of no water leakage from the casing.
(5)Remove the mating ring and inspect the seal ring . If necessary, replace it.
(6)After work, the reverse procedure should be performed. At this time, reconfirm
closure of valve, and opening of valve.
(7)Purge air in the casing by opening plug. And close plug.
Plug
SEALING
From air source
G-1
10mm CuT
G-2
Normally open
Normally close
Fig.-2
From water pump
Shaft rotation must be stopped before operating the inflatable ring.
CAUTION!