EasyManua.ls Logo

Kewaunee Interceptor INT-1100A2 - Chapter 2; Replacement & Repair of Key Parts

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and Technical Manual Chapter 2
Interceptor Biological Safety Cabinet Class II A2
October 2019
2.1
CHAPTER 2
Replacement and Repair of Key Parts
Figure 2.1 BSC with Top Front Panel open
Conditions 1, 2 and 3 mentioned in this section are all behind the Air Chamber
Panel, which is accessible by lifting the Top Front Panel. Before opening the Air
Chamber Panel, a complete decontamination of the upper plenum area is required.
This decontamination step is essential since the lters and surfaces of the upper
chamber will be contaminated.
ê
! WARNING
Opening the Air Chamber Access Panel requires a complete decontamination
of the upper plenum area. Decontamination may only be performed by an
NSF Accredited Technician.
Air
Chamber
Panel
Screw Hole
(both screws must
be removed to open
Top Front Panel)
Top Front
Panel
(shown in
open position)
Screw Hole
Factory Seal
Serial Number