EasyManua.ls Logo

Kia e-niro - Extraction Operations

Kia e-niro
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Emergency Procedures
Extraction Operations
Vehicle Stabilization
Use standard stabilization (cribbing) points,
as shown beside. Always be sure to connect
to a structural member of the vehicle and
avoid placing cribbing under high voltage
cables, fuel lines and other areas not
normally considered acceptable.
The
Niro
EV is an electric model. Because of the high voltage components contained therein,
first responders should pay special attention when they extract occupants in the car. Before
performing any extraction operations, the first responders should "Identify, Immobilize and
Disable" the vehicle as discussed in sections on page 12-17.
Extraction
tools and procedure
When responding to an incident involving a Niro EV, we recommend that the first responders
follow their organization’s standard operating procedures for assessing and dealing with
vehicle emergencies.
When the first responders cut the vehicle, they should always pay special attention to the
airbag system, orange colored high voltage cables and other high voltage components so that
the parts are not damaged, to create a risk of explosion.
Location
of ultra-high strength steel
In these images, high strength steel is
used in the areas colored in blue and
ultra
-high strength steel is used in the
red colored areas. Depending on the
tools used, ultra high strength steel
can be challenging or impossible to
cut. If necessary, use a workaround
technique.
Mild steel
High
strength steel
Ultra
-high strength steel

Related product manuals