BioFicient 4-6
Klargester Sewage Treatment Plant
INSTALLATION MANUAL
Part Code
Issue
Description
Date
017904
04
CC1463
Jan 2019
Question and Answer IconNeed help?

Do you have a question about the Kingspan BioFicient 6 and is the answer not in the manual?

Kingspan BioFicient 6 Specifications

General IconGeneral
BrandKingspan
ModelBioFicient 6
CategoryLawn and Garden Equipment
LanguageEnglish

Summary

HEALTH AND SAFETY

MAINTENANCE AND INSPECTION PROCEDURES

Precautions for inspecting and maintaining the equipment, including power isolation.

SELF HELP

Blower Failure

Troubleshooting steps for blower stopping or lack of water distribution.

INSTALLATION

1. EXCAVATE A HOLE & LAY CONCRETE BED

Site excavation and concrete bed preparation, including dimensions and specs.

GENERAL CONCRETE SPECIFICATION

Detailed specifications for concrete mixes according to BS EN 206-1.

2. LOWER UNIT ONTO CONCRETE & ENSURE LEVEL

Procedures for safely lowering the unit and ensuring it is level.

4. BACKFILL THE TANK UNIT

Instructions for backfilling the tank in layers, ensuring compaction and water ballasting.

5. SECOND BACKFILL STAGE

Details on the second stage of backfilling, including water ballasting and consolidation.

6. FURTHER BACKFILL STAGES

Continues backfilling with water/backfill levels and pipework connection.

7. VENTING

Requirements for adequate venting and sealing the air duct to the blower housing.

BioFicient® IPS HLA Installation

Physical Installation of Float and Cable

Steps for removing components, drilling, fitting glands, and routing float cables.

Float Positioning

Guidance on setting the correct vertical position of the float relative to the pivot weight.

Final Hose Connections

Final connection of hoses for sludge recycle and diffusers on all plant types.

CONTROL PANEL INSTALLATION

CONTROL PANEL ENTRY POINTS DEPENDING ON THE EQUIPMENT SUPPLY

SLUDGE RETURN SOLENOID RUN AND PAUSE TIME SETTING (IF FITTED)

SLUDGE RETURN SOLENOID RUN AND PAUSE ANALOGUE TIMER SETTING (IF FITTED)

COMPLETING THE INSTALLATION (refer to Control Panel illustration on page 13.).

Final steps for control panel installation, including battery and alarm connections.

CONTROL PANEL FAULT CODES AND FUSES

Table listing fault codes, conditions, fuses, and amperage ratings.

MAINTENANCE

MAINTENANCE SCHEDULE

A schedule outlining daily, monthly, three-monthly, and annual maintenance tasks.

WARRANTY

FAULT FINDING

1. COMPRESSOR NOT RUNNING

Troubleshooting steps for a compressor that is not running, covering power issues.