Do you have a question about the Kingspan Klargester 1002510 and is the answer not in the manual?
Notes on IEE Wiring Regulations and statutory requirements for electrical installations.
Guidance on electrical supply, cable installation, and safety for outdoor use.
Instructions for mounting the control panel and frame.
Wiring instructions for integral discharge pumps and high-level alarms.
Installation of beacon units and PPFDS for failure warnings.
Specific installation for Biodisc units, including sludge return pumps.
Final steps for wiring, battery connection, and system power-up.
Guides through the initial power-up, country, date, and time settings.
Explanation of the main operating screen and navigation.
Lists alarm triggers, indications, and how to mute the beeper.
Covers viewing service due dates and setting service alarms.
Information on volt-free contacts for external alarm reporting.
Overview of menu options for editing, logging, and settings.
Instructions for editing output start, stop, run, and pause times.
How to view the last ten alarm conditions and their timestamps.
Procedure for setting the control unit's current date and time.
How to configure inputs, alarms, and beeper settings.
Displays the battery charger status and charging modes.
Option to reset the control unit to its original factory settings.
Detailed technical data for the control unit, including power and fusing.
Technical specifications and compatibility information for the LED beacon.
Default operating times for the de-sludge pump by region.
Default operating times for the motor/blower unit.
Default operating times for the chemical dosing pump by region.
Notes on IEE Wiring Regulations and statutory requirements for electrical installations.
Guidance on electrical supply, cable installation, and safety for outdoor use.
Instructions for mounting the control panel and frame.
Wiring instructions for integral discharge pumps and high-level alarms.
Installation of beacon units and PPFDS for failure warnings.
Specific installation for Biodisc units, including sludge return pumps.
Final steps for wiring, battery connection, and system power-up.
Guides through the initial power-up, country, date, and time settings.
Explanation of the main operating screen and navigation.
Lists alarm triggers, indications, and how to mute the beeper.
Covers viewing service due dates and setting service alarms.
Information on volt-free contacts for external alarm reporting.
Overview of menu options for editing, logging, and settings.
Instructions for editing output start, stop, run, and pause times.
How to view the last ten alarm conditions and their timestamps.
Procedure for setting the control unit's current date and time.
How to configure inputs, alarms, and beeper settings.
Displays the battery charger status and charging modes.
Option to reset the control unit to its original factory settings.
Detailed technical data for the control unit, including power and fusing.
Technical specifications and compatibility information for the LED beacon.
Default operating times for the de-sludge pump by region.
Default operating times for the motor/blower unit.
Default operating times for the chemical dosing pump by region.
| Brand | Kingspan |
|---|---|
| Model | Klargester 1002510 |
| Category | Control Panel |
| Language | English |