EasyManua.ls Logo

Kohler K-14406 - Spout Installation; Handle Body Installation

Kohler K-14406
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1014299-2-B
3
Kohler Co.
Nut
Apply
Plumbers
Putty
Metal
Washer
Escutcheon
Apply Plumbers
Putty
Handle
Body
Cross-
Handle
1. Spout Installation
- Apply a bead of plumbers putty or other sealant to the underside of the
spout according to the putty manufacturer’s instructions.
- Fit the spout through the top of the lavatory.
- Install the metal washer and nut. Position the washer so the second hole
lines up with the drain lift rod hole. Securely wrench tighten the nut.
- Remove any excess putty or sealant.
2. Handle Body Installation
- Apply a bead of plumbers putty or other sealant to the underside of the
escutcheons according to the putty manufactur er’s instructions.
- Insert the handle bodies into the mounting holes from the top of the
lavatory. Make sure the body marked “COLD” is installed in the
right-hand hole (as viewed from the front of the lavatory).

Related product manuals