EasyManua.ls Logo

Kohler K-1954 - Installation Completion

Kohler K-1954
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. Complete the Installation
IMPORTANT! Wait at least 10 seconds after the last test flush
before installing the tank lid. Hold your hand over the sensor for 1-2
seconds after installing the lid to confirm proper operation.
NOTE: If you are unable to activate the sensor immediately after
installing the tank lid, wait a minimum of 5 minutes for the sensor
to calibrate.
Position the tank lid in front of the module on the tank, in the
install position.
Install the emblem directly above the sensor indicator.
Install the tank lid.
Hold your hand approximately 1 (25 mm) above the module.
The toilet will flush.
Check for proper operation.
Consult the troubleshooting chart for operation or performance
issues.
3" (76 mm)
Emblem
Sensor Indicator
1216369-2-D 16 Kohler Co.

Related product manuals