6. Secure the Top of the Carriage
Drill pilot holes at the lag bolt locations.
Install two 6 (152 mm) long support 2x4’s, located at the top of
the carriage, aligned with the mounting holes, 1-5/8 (41 mm) in
from the front edge of the studs.
Secure the carriage to the support studs using 2 (51 mm) long
(minimum) lag bolts (not supplied), one on each side.
At the location of the inlet, drill a 2 (51 mm) hole.
Connect the Power - Bidet Seat Installations
WARNING: Risk of personal injury. Disconnect the power
before connecting the wires.
CAUTION: Risk of personal injury. The electrical outlet
must be connected to a GFCI or RCD protected circuit or an
accessible Ground-Fault Circuit-Interrupter (GFCI) or
Residual-Current Device (RCD) must be installed.
NOTE: This step is only needed if the electrical box was installed in
the Prepare the Carriage section.
Connect the power following all applicable codes.
Ø 2"
(51 mm)
6" (152 mm)
Inlet
1-5/8"
(41 mm)
Lag Bolt
Screws
2x4
Kohler Co. 11 1142998-2-D

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler K-6284 and is the answer not in the manual?

Kohler K-6284 Specifications

General IconGeneral
BrandKohler
ModelK-6284
CategoryPlumbing Product
LanguageEnglish

Related product manuals