EasyManua.ls Logo

Kohler K-72218-B7-CP - Prepare for Installation

Kohler K-72218-B7-CP
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Prepare for Installation
NOTE: Handle orientation is designed to be on the right.
Thread the screws into the ring 1/4 (6 mm) past the surface.
Use the escutcheon included with your faucet.
Insert the faucet through the mounting surface with the handle
on the right.
1/4"
(6 mm)
Escutcheon
1384293-2-A 4 Kohler Co.

Related product manuals