EasyManuals Logo

Kohler K-9132 Installation And Care Guide

Kohler K-9132
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
Empaque/conector
NOTA: Para terminar la instalación del desagüe, puede utilizar un empaque/conector
(provisto) o calafateo tradicional. Si va a utilizar el calafateo tradicional, continúe en
la sección Calafateo tradicional.
Con solución jabonosa, lubrique el empaque/conector.
Con las letras embosadas del empaque/conector hacia arriba, coloque el
empaque/conector sobre el tubo del desagüe.
NOTA: Si es necesario, utilice un martillo y la herramienta para calafatear para
empujar el empaque/conector dentro del cuerpo de la coladera. Si no hay una
herramienta para calafatear disponible, utilice un pedazo de madera angosto.
Empuje el empaque/conector hacia abajo dentro del cuerpo de la coladera hasta
que la parte superior del tubo del desagüe esté parejo con la parte superior del
empaque/conector.
Prosiga en la sección Verificación de la instalación.
3. Traditional Caulking
WARNING: Risk of personal injury. Pre-heat the wet or cold caulking lead on
the side of the lead furnace before adding it to a pot containing molten caulking
lead. Ensure the fixture, drain pipe, and all drain components are dry before
proceeding. If these steps are not followed, an explosion can occur if moisture
comes in direct contact with molten caulking lead.
Dry the fixture, drain pipe, and all drain components.
Melt the pre-heated wet or cold caulking lead into a pot. Use enough lead to
ensure that the joint can be filled in one pour.
NOTE: To eliminate loose oakum fibers: Heatayarningorpackingironinthepot
with the molten caulking lead. Pack the oakum into the joint with the heated yarning
iron or packing iron.
While the lead is melting: Yarn and pack oakum into the gap between the drain
pipe and the strainer body. The packed oakum must be 1-5/16 (33 mm) deep
from the top of the strainer body [5/8 (16 mm) thickness].
Oakum/Filasse/Estopa
1-5/16"
(33 mm)
Lead/Plomb/Plomo
Kohler Co. 9 1114755-2-B

Other manuals for Kohler K-9132

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler K-9132 and is the answer not in the manual?

Kohler K-9132 Specifications

General IconGeneral
BrandKohler
ModelK-9132
CategoryPlumbing Product
LanguageEnglish

Related product manuals