EasyManua.ls Logo

Kohler K-942 - Spout Installation Guide

Kohler K-942
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Spout Installation
Apply a bead of plumbers putty or other sealant to the underside
of the spout or putty ring (if supplied) according to the putty
manufacturer’s instructions.
Locate the center hole and insert the spout.
Position the metal washer so the second hole lines up with the
drain lift rod hole on the back of the spout.
Securely tighten the nut with a wrench. Do not overtighten.
Remove any excess putty or sealant.
Apply Plumbers
Putty
Putty Ring
(if included)
Metal
Washer
Nut
Kohler Co. 3 1009772-2-B

Related product manuals