B02029 Structural Components B2-7
Installation
Repeat above procedures in reverse order for instal-
lation of the deck and components. Tighten all
attaching hardware to standard torque specifications
as listed in Section A, Standard Torque Chart and
Tables.
Clean all mount mating surfaces before
installation.
Clean mounting area before installing ground
cables.
Be certain all electrical connections and harness
clamps are reinstalled and secure.
If the air conditioning system has been
discharged, refer to Section N, Operator Comfort,
for the correct procedure for system service.
1. Start engine and allow systems to charge.
Observe for any air or oil leaks. Make sure all
shields, covers and clamps are in place.
2. Service the hydraulic reservoir if required.
Check for proper operation of the steering and
brake systems, including dynamic retarding.
CENTER DECK
Center deck removal only requires removal of any
attached hoses cables etc. before removing the
mounting hardware and lifting the deck structure off.
Follow proper shutdown procedures as
described on page B2-3.