EasyManua.ls Logo

Komatsu PC15R-8 User Manual

Komatsu PC15R-8
208 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
WEAM002702
HYDRAULIC EXCAVATOR
PC12R-8
PC12R-8 HS
PC15R-8
PC15R-8 HS
SERIAL NUMBER
PC12R-8 - F31493 and up
PC12R-8 HS - F31493 and up
PC15R-8 - F22262 and up
PC15R-8 HS - F22262 and up
Operation & Maintenance
Manual
Unsafe use of this machine may cause serious injury
or death. Operators and maintenance personnel
must read this manual before operating or maintain-
ing this machine.
This manual should be kept inside the cab for refer-
ence and periodically reviewed by all personnel who
will come into contact with the machine.
WARNING

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Komatsu PC15R-8 and is the answer not in the manual?

Komatsu PC15R-8 Specifications

General IconGeneral
BrandKomatsu
ModelPC15R-8
CategoryExcavators
LanguageEnglish

Summary

SAFETY AND ACCIDENT PREVENTION

2.1 SAFETY, NOISE AND VIBRATION PLATES

Information on safety, noise, and vibration plates on the machine.

2.2 GENERAL PRECAUTIONS

General safety guidelines and precautions for machine operation and maintenance.

2.3 PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE

Essential checks and safety measures before starting the engine.

THE MACHINE AND ITS OPERATIONS

3.3.5 MACHINE CONTROLS

Detailed explanation of all machine control levers and pedals.

3.6 USE OF THE MACHINE

Comprehensive guide on operating the machine safely and efficiently.

3.6.2 STARTING THE ENGINE

Step-by-step instructions for starting the engine.

PRECAUTIONS FOR MAINTENANCE

2.8 PRECAUTIONS FOR MAINTENANCE

General safety precautions to be followed during maintenance operations.

2.8.9 STOP THE ENGINE BEFORE CARRYING OUT ANY MAINTENANCE OPERATION OR INSPECTION

Critical safety step to stop the engine before any maintenance.

TROUBLESHOOTING

3.16 TROUBLESHOOTING

Guide to identifying and resolving common machine problems.

MAINTENANCE PLAN

4.7 MAINTENANCE PLAN

Schedule for periodic maintenance tasks based on operating hours.

ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)

Related product manuals