EasyManua.ls Logo

KPS KPS-PF10 - OPERATING INSTRUCTIONS; AC Current Measurement; CLAMP LEAKER LAYOUT

KPS KPS-PF10
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
KPS-PF10 • Leakage clamp meter
ENG
4. OPERATING INSTRUCTIONS
AC Current Measurement
1. Set the Slip key of range at desired range position.
2. Set the Slip key of power at “1” (ON) position.
3. Press the trigger to open transformer jaw and to clamp one conductor only,
making sure that the jaw is rmly closed around the conductor.
4. Read the measure result from the display.
5. CLAMP LEAKER LAYOUT

Related product manuals