EasyManua.ls Logo

Kraus KPF-1675 - Installation Steps; Step 1: Remove mounting hardware; Step 2 A: Faucet installation - with deck plate

Kraus KPF-1675
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Step 1: Remove mounting hardware
Remove the mounting
screws (5C), mounting nut
(5B), and rubber & metal
washer (5A) from the
mounting pipe
5A
5B
5C
Step 2A: Faucet installation - with deck plate
For three-hole installation:
Deck plate, base plate
(see below), and silicone
sealant (optional) are
required
Note: optional deck plate
DP01, not included

Related product manuals