EasyManua.ls Logo

Kurt AngLock D810 - Page 12

Kurt AngLock D810
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 ENGLISH |
Maintenance Schedule
3 to 6 months
1. Open vise to maximum opening.
2. Remove spiral snap ring and washer from hex end of the vise
screw.
3. Slide the movable jaw toward the stationary.
4. Remove the thrust bearing assembly consisting of (2) thrust
washers and (1) thrust bearing from the counter bore in the end of
the body.
5. Clean and inspect the counter bore, thrust washers and thrust
bearing.
6. Apply water resistant grease to the thrust washer (i.e. marine grade
grease)
7. Install thrust bearing assembly on the screw and slide movable jaw
back.
8. Install washer and spiral retaining ring.
9. Your vise is now ready to use.