EasyManua.ls Logo

Kurzweil PC88 - Page 29

Kurzweil PC88
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter
2
Diagnostics
Marge
Test
This
test
confirms
that
Marge
is
installed
properly
and
successfully
interfacing
with
the
microprocessor.
Failure
of
this
test
indicates
a
problem
with
Marge
(U2),
associated
selection
circuitry
(74LS164,
U16)
or
traces
linking
Marge
to
U1
and
U21.
While
this
test
is
in
progress,
one
should
see
activity
on
Marge's
chip
select
and
write
enable
pins.
Also
check
the
address
and
data
pins.
Delay
RAM
Test
This
test
writes
to
the
entire
delay
RAM
space
and
verifies
that
the
writing
was
successful.
Marge
must
be
operational
before
this
test
can
pass,
since
the
processor
must
use
Marge
to
access
the
delay
RAM.
Failure
of
this
test
indicates
a
failure
of
Marge
or
the
delay
RAM
(U9
and
U10).
While
this
test
loops
on
failure,
one
should
see
periodic
activity
of
the
RAS,
CAS,
and
write
enable
pins
on
each
DRAM
chip.
Also
look
at
the
address
and
data
pins.
LCD
Test
The
LCD
Test
writes
a
group
of
characters
to
the
LCD
and
verifies
that
the
same
characters
can
be
read
back
again.
There
is
a
1
second
pause
between
the
times
that
the
characters
are
written
and
read
so
that
the
user
can
visually
inspect
the
pattern.
A
failure
of
this
test
indicates
a
problem
with
the
LCD
or
the
related
address
decoding
circuitry
(74LS245,
U3;
74HCU04,
U8).
PC88
Service
Manual
2-11

Other manuals for Kurzweil PC88

Related product manuals