Setting of regeneration cycles
By default the regeneration is planned every 3 washing cycles.
However, it is possible to plan the Regeneration on the basis of water hardness.
When the number of cycles suitable for the water hardness of your system has been established, it is
possibile to configure the dip-switch on the electronic card placed in the control box.
Follow the instructions to programme the electronic board.
REGENERATION SETTING PROGRAMMING (cod. 0300827)
1 - With the machine stopped, check the position of the dip-switches on the electronic board and
memorise it;
050F
add
ON
OFF
123
4
2 - Then set the dip-switch in accordance with the following table, according to the number of
washing cycles you wish to set to start the regeneration operation signaling;
123
4
ON
ON
ON
ON
ON
ON
ON
ON
Conteggio disabilitato
Compte inactif
Count-off
Nachzahlung
nicht Aktiviert
CICLI
CYCLES
CYCLES
ZYKLUS
CICLI
CYCLES
CYCLES
ZYKLUS
CICLI
CYCLES
CYCLES
ZYKLUS
CICLI
CYCLES
CYCLES
ZYKLUS
CICLI
CYCLES
CYCLES
ZYKLUS
CICLI
CYCLES
CYCLES
ZYKLUS
CICLI
CYCLES
CYCLES
ZYKLUS
3
1
2
6
4
5
7
123
4
1234
1234
1234
123
4
123
4
1234
3 - Open the door of the machine;
4 - Press the “B” START button;
5 - Keep the “B” START button pressed and turn the machine ON by using the “A” switch;
6 - Wait for the lighting of the cycle lamp;
7 - Turn the machine OFF by using the “A” switch;
8 - Reset the dip-switches according to the original position of the washing period programming;
050F
add
ON
OFF
1234