Check the mains voltage corresponds to the equipment’s
rating (F1).
The supply cable is provided without plug.
Use a plug which guarantees the plant earthing.
Only a technician or a skilled person should perform the
connection of the plug to the electric cable.
Should anyone use an extension cable between
the tooling and the socket, it must have the same
characteristics as the cable supplied (minimum
diameter of the wire 2.5 mm
2
) with a maximum length
of 50 mt. Higher lengths and lower diameters can provoke
excessive voltage falls and also an anomalous working of
the equipment.
CONNECTION OF THE TOOLING TO THE POWER SUPPLY
Check the ON/OFF switch (F2) is on the "OFF" position (0)
before connecting the cable to the mains.
Place the pressure control knob (F3) on the “MINposition
(turn counterclockwise).