EasyManuals Logo

Launch VALUE-500 User Manual

Launch VALUE-500
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
- 10 -
2.Using Refrigerant Refill function to add about 3kg refrigerant into the equipment
(refer to the procedures of Refrigerant Cylinder Refill)
Operating procedures
1.Refrigerant Cylinder Refill
The tank contains no refrigerant as leaving the factory. Refrigerant must be refilled
before operation. The recommended refill weight is 3-6kg. Operation is as follows.
1. Attach the blue hose to the main equipment’s low pressure valve.
2. Attach the quick couplings of the blue hose to the refrigerant cylinder.
3. Turn off the quick couplings of the red hose.
4. Turn on the equipment, enter themain interface and select “equipment
maintenance”, then click the option of Refrigerant Refill

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Launch VALUE-500 and is the answer not in the manual?

Launch VALUE-500 Specifications

General IconGeneral
BrandLaunch
ModelVALUE-500
CategoryService Equipment
LanguageEnglish