Operating
• Equipment must be installed by a specialist.
• As required, push-fit appropriate nozzle or reflector.
• Reduce air flow as required by use of the air slide (5).
• Adjust hot-air temperature by use of the potentiometer (3).
• Switch on (2) and allow to warm up for about 5 min.
• Cool down the tool after use.
Change of nozzles/reflectors
• Before changing nozzles/reflectors, allow the tool to cool down, or use only
combination pliers.
• Do not touch hot nozzle/reflector and make sure to put it only on a heat resistant
surface, because of the fire hazard.
• The nozzles/ reflectors are easily pushed onto the conical heater tube (8) and are
then secured by fastening the screw on the clamp.
• Only Leister nozzles/ reflectors should be used.
OPERATION Leister MISTRAL
4