EasyManuals Logo

Lennox EL296UHE Series Unit Information

Lennox EL296UHE Series
65 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #23 background imageLoading...
Page #23 background image
Page 23
TABLE 15
OUTDOOR TERMINATION USAGE*
Input Size
Vent Pipe
Dia. in.
STANDARD CONCENTRIC
Flush Mount
Kit
Wall Kit
Field
Fabricated
1-1.2 inch 2 inch 3 inch
2 inch 3 inch
71M80 (US)
4
44W92
(CA)
69M29 (US)
4
44W92
(CA)
60L46 (US)
4
44W93
(CA)
51W11 (US)
51W12
(CA)
22G44 (US)
4
30G28 (CA)
44J40 (US)
4
81J20 (CA)
045
6
1-1/2
3
YES YES
1
YES
5
YES
2
YES
2
3
YES YES
1
YES
5
YES
2
YES
2-1/2
3
YES YES
1
YES
5
YES
2
YES
3
3
YES YES
1
YES
5
YES
2
YES
070
6
1-1/2
3
YES YES
1
YES
5
YES
2
YES
2
3
YES YES
1
YES
5
YES
2
YES
2-1/2
3
YES YES
1
YES
5
YES
2
YES
3
3
YES YES
1
YES
5
YES
2
YES
090
2
3
YES YES
5
YES YES YES
2-1/2
3
YES YES
5
YES YES YES
3
3
YES YES
5
YES YES YES
110
2 YES YES
5
YES YES YES
2-1/2 YES YES
5
YES YES YES
3 YES YES
5
YES YES YES
135 3 YES YES
5
YES YES
NOTE - Standard Terminations do not include any vent pipe or elbows external to the structure. Any vent pipe or elbows external to the structure must
be included in total vent length
calculations. See vent length tables.
* Kits must be properly installed according to kit instructions.
1Requires eld-provided outdoor 1-1/2” exhaust accelerator.
2Concentric kits 71M80 and 44W92 include 1-1/2” outdoor accelerator, when used with 045 and 070 input models. 1-1/2 in pipe must transition to
2 in pipe when used with a concentric kit.
3 Flush mount kits 51W11 and 51W12 includes 1-1/2 in. outdoor exhaust accelerator, required when used with 045, 070 and 090 input models. 1-1/2
in pipe must transition to 2 in pipe when used with the ushmount kit
4 Termination kits 30G28, 44W92, 44W93 and 81J20 are certied to ULC S636 for use in Canada only.
5 See TABLE 8 for vent accelerator requirements.
6 2 in to 1-1/2 in reducer required must be eld provided.
Joint Cementing Procedure
All cementing of joints should be done according to the
specications outlined in ASTM D 2855.
1 - Measure and cut vent pipe to desired length.
2 - Debur and chamfer end of pipe, removing any
ridges or rough edges. If end is not chamfered,
edge of pipe may remove cement from tting socket
and result in a leaking joint.
NOTE - Check the inside of vent pipe thoroughly for
any obstruction that may alter furnace operation.
3 - Clean and dry surfaces to be joined.
4 - Test t joint and mark depth of tting on outside of
pipe.
5 - Uniformly apply a liberal coat of PVC primer for
PVC or use a clean dry cloth for ABS to clean inside
socket surface of tting and male end of pipe to
depth of tting socket.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system
check. Allow fumes to dissipate for at least 5 minutes
before placing unit into operation..
NOTE - Time is critical at this stage. Do not allow
primer to dry before applying cement.
6 - Promptly apply solvent cement to end of pipe and
inside socket surface of tting. Cement should be
applied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply
second coat to end of pipe.

Other manuals for Lennox EL296UHE Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox EL296UHE Series and is the answer not in the manual?

Lennox EL296UHE Series Specifications

General IconGeneral
BrandLennox
ModelEL296UHE Series
CategoryFurnace
LanguageEnglish

Related product manuals