GAS PIPING 2 (51) ELECTRICAL INLETS
INLET
FLUE
OUTLET "
1
1
*NOTE - The supply air opening is _ with a 3/4 inch (19 n
scoredflange that may
sionsshown were taken after the flange was bent,
The double scoredflange at the front of the supply air open-
ing may be bent for a total opening dimension (front to rear)
of either 19-1/2 incheS(495 ram) or 19 inches (483 ram),
,4_ A -_----Ib
AIRtFLOW
(25
L
,ql'-**C_ _ 1
Opening- I (25)
FRONT VIEW
F Left Side
ELECTRICAL
iNLETS
(Ei_erSide)
1
(25)
TOP VIEW
29-5/8
(752)
.3/4(19) II
19-1/2 ReturnAir_l L__ 1
(495) Opening Vl r" (25)
SIDE VIEW
Model No. A B C D E F G
G24M2-45 m. 17 36-1/4 15 6-3/4 2-7/16 1%1/2 6-1/2
G24M2-60
G24M3_60
G24M3-75 rnm 432 921 381 171 62 293 165
G24M4.75
G24M3/4-100 m, 20-1/2 39 18-1/2 8-3/8 4-1/4 13 8
G24M3/4.120
G24M4/5-100
G24M4/5-120 mm 521 991 470 213 108 931 203
m, 23-1/4 39 21-1/4 9-3/4 4-1/4 12-31/32 7-3/32
G24M4fS-140
mm 591 991 540 248 108 329 180
Page 2