Lexus LX - Steering Linkage Inspection; INSPECT TIE ROD END SUB-ASSEMBLY LH; INSPECT TOTAL PRELOAD

Lexus LX
560 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEERING LINKAGE > INSPECTION
for Preparation Click here
1. INSPECT TIE ROD END SUB-ASSEMBLY LH
a. Install the nut.
b. Flip the ball joint stud back and forth 5 times as shown in the illustration.
c. Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per
turn and check the torque reading on the 5th turn.
Turning torque:
0.981 to 3.432 N*m (10.0 to 35.0 kgf*cm, 8.692 to 30.375 in.*lbf)
HINT:
Make sure the dust cover of the tie rod end ball joint has no cracks or damage.
If necessary, replace the tie rod end.
2. INSPECT TOTAL PRELOAD
a. Put matchmarks on the dust cover and steering link.
HINT:
Make sure that the steering link is centered when placing matchmarks.
b. Remove the dust cover.
c. Temporarily install the 2 steering rack ends to the power steering rack.
NOTICE:
Do not fully turn the power steering rack without the steering rack ends as it
may damage the oil seal in the rack housing.
d. Using SST, fully turn the power steering rack right and left 10 times to settle it.
SST
09616-00011
e. Using SST, turn the control valve and measure the preload.
SST
09616-00011
Standard preload (turning):
2.4 N*m (24 kgf*cm, 21 in.*lbf)
If the turning torque is not as specified, replace the power steering link.